Advertisement
UK markets open in 6 hours 9 minutes
  • NIKKEI 225

    37,631.18
    +2.70 (+0.01%)
     
  • HANG SENG

    17,284.54
    +83.27 (+0.48%)
     
  • CRUDE OIL

    83.86
    +0.29 (+0.35%)
     
  • GOLD FUTURES

    2,341.20
    -1.30 (-0.06%)
     
  • DOW

    38,085.80
    -375.12 (-0.98%)
     
  • Bitcoin GBP

    51,352.59
    -303.09 (-0.59%)
     
  • CMC Crypto 200

    1,387.95
    +5.38 (+0.39%)
     
  • NASDAQ Composite

    15,611.76
    -100.99 (-0.64%)
     
  • UK FTSE All Share

    4,387.94
    +13.88 (+0.32%)
     

UK gas storage site Rough to switch to single train injection around Aug 6

Aug 3 (Reuters) - Britain's biggest gas storage site, Rough, is to move from dual train to single train gas injection on or around Aug. 6, its operator Centrica (LSE: CNA.L - news) said on Monday.

"The exact date will depend on a number of factors, including customer nominations," the British utility said.

Centrica last month said it would extend a limit on the maximum operating pressure at Rough until the end of 2016 after it discovered a potential issue with well integrity.

The trains, or compressors, are used to inject gas into the facility. (Reporting by Oleg Vukmanovic in Milan, editing by Louise Heavens)