Advertisement
UK markets closed
  • FTSE 100

    8,213.49
    +41.34 (+0.51%)
     
  • FTSE 250

    20,164.54
    +112.24 (+0.56%)
     
  • AIM

    771.53
    +3.42 (+0.45%)
     
  • GBP/EUR

    1.1665
    +0.0013 (+0.11%)
     
  • GBP/USD

    1.2575
    +0.0028 (+0.23%)
     
  • Bitcoin GBP

    50,122.50
    -835.06 (-1.64%)
     
  • CMC Crypto 200

    1,371.31
    +58.68 (+4.47%)
     
  • S&P 500

    5,158.86
    +31.07 (+0.61%)
     
  • DOW

    38,763.02
    +87.34 (+0.23%)
     
  • CRUDE OIL

    78.62
    +0.51 (+0.65%)
     
  • GOLD FUTURES

    2,330.20
    +21.60 (+0.94%)
     
  • NIKKEI 225

    38,236.07
    -38.03 (-0.10%)
     
  • HANG SENG

    18,578.30
    +102.38 (+0.55%)
     
  • DAX

    18,158.70
    +157.10 (+0.87%)
     
  • CAC 40

    7,993.69
    +36.12 (+0.45%)
     

Equinor's Hammerfest LNG plant outage extended until Saturday

FILE PHOTO: The logo of Equinor is set up at liquefied natural gas plant Hammerfest LNG in Hammerfest

OSLO (Reuters) - The planned restart of Equinor's Hammerfest liquefied natural gas (LNG) plant, which was evacuated and shut earlier this week due to a gas leak, has been postponed until Saturday, transparency data showed on Friday.

The Norwegian energy group had previously said it planned to restart production on Friday at 1000 GMT after the gas leak had been repaired.

The outage at the plant, also known as Melkoeya, is now listed to end on Saturday at 1000 GMT on a transparency website maintained by gas infrastructure operator Gassco.

It could also restart earlier, an Equinor spokesperson said.

ADVERTISEMENT

The facility, which has a capacity to deliver 18.4 million cubic metres (mcm) per day, was briefly evacuated on Tuesday while already offline for a maintenance outage initially scheduled to last just one day.

(Reporting by Nora Buli, editing by Stine Jacobsen and Terje Solsvik)