Advertisement
UK markets closed
  • FTSE 100

    7,895.85
    +18.80 (+0.24%)
     
  • FTSE 250

    19,391.30
    -59.37 (-0.31%)
     
  • AIM

    745.67
    +0.38 (+0.05%)
     
  • GBP/EUR

    1.1607
    -0.0076 (-0.65%)
     
  • GBP/USD

    1.2370
    -0.0068 (-0.55%)
     
  • Bitcoin GBP

    51,689.82
    +1,334.82 (+2.65%)
     
  • CMC Crypto 200

    1,371.97
    +59.34 (+4.52%)
     
  • S&P 500

    4,967.23
    -43.89 (-0.88%)
     
  • DOW

    37,986.40
    +211.02 (+0.56%)
     
  • CRUDE OIL

    83.24
    +0.51 (+0.62%)
     
  • GOLD FUTURES

    2,406.70
    +8.70 (+0.36%)
     
  • NIKKEI 225

    37,068.35
    -1,011.35 (-2.66%)
     
  • HANG SENG

    16,224.14
    -161.73 (-0.99%)
     
  • DAX

    17,737.36
    -100.04 (-0.56%)
     
  • CAC 40

    8,022.41
    -0.85 (-0.01%)
     

Finland moves ahead with floating LNG terminal to bolster energy security

COPENHAGEN (Reuters) -Fortum and Finnish gas system operator Gasgrid announced on Thursday a deal to place Finland's first floating LNG import terminal at the Baltic Sea port of Inkoo, aiming to have it ready to operate next winter.

The planned floating storage and regasification (FSRU) terminal, which was first announced in April, is crucial to secure Finland energy supplies after Russia halted gas exports last month.

"The LNG terminal will make it possible for us to break free from Russian gas," Finland's Finance Minister Annika Saarikko said in a statement.

The vessel, in which liquefied natural gas is re-vaporised and fed into the gas transmission network, will be able to cover the gas needs of both Finland and Estonia.

ADVERTISEMENT

LNG will be delivered to the terminal by tankers from the global market two to three times a month, Gasgrid said.

The FSRU will be leased from U.S. based Excelerate Energy for a duration of ten years, Finland, which does not produce gas domestically, announced last month.

Gasgrid and the Estonian electricity and gas transmission system operator Elering are also developing a potential site for the FSRU in Estonia, to ensure that an alternative exists in case of delay.

(Reporting by Stine Jacobsen, editing by Terje Solsvik, Kirsten Donovan)