Advertisement
UK markets closed
  • FTSE 100

    8,433.76
    +52.41 (+0.63%)
     
  • FTSE 250

    20,645.38
    +114.08 (+0.56%)
     
  • AIM

    789.87
    +6.17 (+0.79%)
     
  • GBP/EUR

    1.1622
    +0.0011 (+0.09%)
     
  • GBP/USD

    1.2525
    +0.0001 (+0.01%)
     
  • Bitcoin GBP

    48,482.10
    -1,654.06 (-3.30%)
     
  • CMC Crypto 200

    1,261.19
    -96.82 (-7.13%)
     
  • S&P 500

    5,222.68
    +8.60 (+0.16%)
     
  • DOW

    39,512.84
    +125.08 (+0.32%)
     
  • CRUDE OIL

    78.20
    -1.06 (-1.34%)
     
  • GOLD FUTURES

    2,366.90
    +26.60 (+1.14%)
     
  • NIKKEI 225

    38,229.11
    +155.13 (+0.41%)
     
  • HANG SENG

    18,963.68
    +425.87 (+2.30%)
     
  • DAX

    18,772.85
    +86.25 (+0.46%)
     
  • CAC 40

    8,219.14
    +31.49 (+0.38%)
     

Gas withdrawals from Centrica's UK storage site in unplanned cut

LONDON, Feb 23 (Reuters) - Britain's biggest underground gas storage facility, Rough, was undergoing an unplanned cut to withdrawals on Monday, operator Centrica (LSE: CNA.L - news) said.

The flow cut began at 0600 GMT and is expected to reduce withdrawal capacity by 9 million cubic meters (mcm) per day, a Centrica spokeswoman said.

The withdrawal cut is expected to end at 0559 GMT on Tuesday the spokeswoman said. (Reporting by Susanna Twidale, editing by Louise Heavens)