Advertisement
UK markets close in 7 hours 54 minutes
  • FTSE 100

    8,126.50
    +47.64 (+0.59%)
     
  • FTSE 250

    19,706.71
    +104.73 (+0.53%)
     
  • AIM

    755.29
    +2.17 (+0.29%)
     
  • GBP/EUR

    1.1652
    -0.0005 (-0.04%)
     
  • GBP/USD

    1.2503
    -0.0008 (-0.07%)
     
  • Bitcoin GBP

    51,468.12
    +97.71 (+0.19%)
     
  • CMC Crypto 200

    1,388.36
    -8.17 (-0.59%)
     
  • S&P 500

    5,048.42
    -23.21 (-0.46%)
     
  • DOW

    38,085.80
    -375.12 (-0.98%)
     
  • CRUDE OIL

    84.08
    +0.51 (+0.61%)
     
  • GOLD FUTURES

    2,356.50
    +14.00 (+0.60%)
     
  • NIKKEI 225

    37,934.76
    +306.28 (+0.81%)
     
  • HANG SENG

    17,644.09
    +359.55 (+2.08%)
     
  • DAX

    18,009.06
    +91.78 (+0.51%)
     
  • CAC 40

    8,041.44
    +24.79 (+0.31%)
     

Gascade plans pipeline linking LNG to German gas network before year-end

BERLIN (Reuters) - German pipeline operator Gascade said on Tuesday it would provide what is expected to be the first pipeline connecting liquid natural gas (LNG) to the German gas network.

The pipeline, measuring a few hundred meters in length, will connect a first floating storage regasification unit (FSRU) to a landing station near the town of Lubmin, according to Gascade.

The pipeline with a feed-in capacity of approximately 6 gigawatt-hours per hour should be built before the end of 2022, said Gascade.

(Writing by Miranda Murray; Editing by Madeline Chambers)