UK markets close in 3 hours 48 minutes
  • FTSE 100

    6,639.18
    +50.65 (+0.77%)
     
  • FTSE 250

    21,257.04
    +35.58 (+0.17%)
     
  • AIM

    1,190.45
    -1.72 (-0.14%)
     
  • GBP/EUR

    1.1575
    +0.0022 (+0.19%)
     
  • GBP/USD

    1.3921
    +0.0001 (+0.01%)
     
  • BTC-GBP

    35,021.21
    +602.33 (+1.75%)
     
  • CMC Crypto 200

    981.77
    -4.88 (-0.49%)
     
  • S&P 500

    3,901.82
    +90.67 (+2.38%)
     
  • DOW

    31,535.51
    +603.14 (+1.95%)
     
  • CRUDE OIL

    60.76
    +0.12 (+0.20%)
     
  • GOLD FUTURES

    1,728.30
    +5.30 (+0.31%)
     
  • NIKKEI 225

    29,408.17
    -255.33 (-0.86%)
     
  • HANG SENG

    29,095.86
    -356.71 (-1.21%)
     
  • DAX

    14,091.77
    +78.95 (+0.56%)
     
  • CAC 40

    5,831.19
    +38.40 (+0.66%)
     

Global Data Center Construction Market (2021 to 2026) - Featuring ABB, Eaton and Rittal Among Others

Research and Markets
·10-min read

Dublin, Feb. 19, 2021 (GLOBE NEWSWIRE) -- The "Data Center Construction Market - Global Outlook and Forecast 2021-2026" report has been added to ResearchAndMarkets.com's offering.

In-depth Analysis and Data-driven Insights on the Impact of COVID-19 Included in this Global Data Center Construction Market Report

The data center construction market is expected to grow at a CAGR of 4.8% during the period 2021-2026.

The global data center construction market continues to witness a slew of mergers and acquisitions, followed by joint ventures. The growing demand for data center services across industries has led service providers to collaborate, participate, and sign several mergers and acquisitions to expand their portfolios, expand their reach, and increase their penetration in the market. M&A activities have been followed up with joint ventures, which have acted as a catalyst for market growth. Although the market witnessed several mergers and acquisitions in 2020, the most remarkable ones are the acquisition of Digital Realty merger with Interxion in March 2020, Hypertec by Vantage Data Center in Nov 2020 in Canada. The APAC region witnessed a few high-profile mergers, however, the data center market in India observed two majors acquisitions in 2020 - Equinix's acquisition of GPX Global Systems in Aug 2020 and Carlyle Group's merger with Airtel Nxtra Data Center (25%).

The following factors are likely to contribute to the growth of the data center construction market during the forecast period:

  • 5G to Grow Edge Data Center Investments

  • Growth in Procurement of Renewable Energy

  • Innovative UPS Battery Technology

  • Availability of Power Resources and Tax Incentives

The study considers the present scenario of the data center construction market and its market dynamics for the period 2020-2026. It covers a detailed overview of several market growth enablers, restraints, and trends. The report offers both the demand and supply aspects of the market. It profiles and examines leading companies and other prominent ones operating in the market.

KEY QUESTIONS ANSWERED
1. What is the data center construction market size and growth rate in terms of area?
2. What are the innovative data center technologies adopted by data center operators?
3. Which region is the largest revenue contributor to the data center construction market?
4. Which is the targeted segment of growth in data center construction market share?
5. Who are the key players in the global data center construction market?
6. What are the key factors driving the data center construction market?

Key Topics Covered:

1 Research Methodology

2 Research Objectives

3 Research Process

4 Scope & Coverage
4.1 Market Definition
4.2 Base Year
4.3 Scope of The Study
4.4 Market Segments
4.4.1 Market Segmentation by Facility Type
4.4.2 Market Segmentation by Infrastructure
4.4.3 Market Segmentation by Electrical Infrastructure
4.4.4 Market Segmentation by Mechanical Infrastructure
4.4.5 Market Segmentation by Cooling Systems
4.4.6 Market Segmentation by Cooling Techniques
4.4.7 Market Segmentation by General Construction
4.4.8 Market Segmentation by Tier Standards
4.4.9 Market Segmentation by Geography

5 Report Assumptions & Caveats
5.1 Key Caveats
5.2 Currency Conversion
5.3 Market Derivation

6 Market at a Glance

7 Introduction
7.1 Internet & Data Growth
7.2 Data Center Site Selection Criteria
7.2.1 Key
7.3 Electricity Pricing Across Major Data Center Locations
7.4 Submarine Cables

8 Market Opportunities & Trends
8.1 5G To Grow Edge Data Center Investments
8.2 Growing Procurement Of Renewable Energy
8.3 Innovative Data Center Technologies
8.4 Innovative Ups Battery Technology
8.5 Software-Defined Power & Data Center Infrastructure Automation
8.6 Ai Promotes Liquid Immersion & Direct-To-Chip Cooling Adoption

9 Market Enablers
9.1 COVID-19 Boosts Data Center Demand
9.2 Cloud Adoption Drives The Data Center Market
9.3 Snowballing Demand For Big Data & IOT Investments
9.4 Colocation Investment Continue To Rise
9.5 M&As And Joint Venture To Fuel Data Center Growth
9.6 Increasing Construction Of Hyperscale Data Centers
9.7 Availability Of Power Resources & Tax Incentives

10 Market Restraints
10.1 Rising Carbon Emission From Data Centers
10.2 Increase In Power & Network Outages
10.3 Location Constraints For Data Center Construction
10.4 Lack Of Skilled Workforce

11 Market Landscape
11.1 Market Overview
11.2 Investment: Market Size & Forecast
11.3 Area: Market Size & Forecast
11.4 Power Capacity: Market Size & Forecast
11.5 Five Forces Analysis
11.5.1 Threat of New Entrants
11.5.2 Bargaining Power of Suppliers
11.5.3 Bargaining Power of Buyers
11.5.4 Threat of Substitutes
11.5.5 Competitive Rivalry

12 Facility
12.1 Investment: Market Snapshot & Growth Engine
12.2 Power Capacity: Market Snapshot & Growth Engine
12.3 Small Data Centers
12.3.1 Market Overview
12.3.2 Investment: Market Size & Forecast
12.3.3 Power Capacity: Market Size & Forecast
12.4 Medium Data Center
12.4.1 Market Overview
12.4.2 Investment: Market Size & Forecast
12.4.3 Power Capacity: Market Size & Forecast
12.5 Hyperscale Data Center
12.5.1 Market Overview
12.5.2 Investment: Market Size & Forecast
12.5.3 Power Capacity: Market Size & Forecast

13 Infrastructure
13.1 Market Snapshot & Growth Engine
13.2 Market Overview
13.3 Electrical Infrastructure
13.3.1 Market Overview
13.3.2 Market Size & Forecast
13.4 Mechanical Infrastructure
13.4.1 Market Overview
13.4.2 Market Size & Forecast
13.5 General Construction
13.5.1 Market Overview
13.5.2 Market Size & Forecast

14 Electrical Infrastructure
14.1 Market Snapshot & Growth Engine
14.2 UPS Systems
14.2.1 Market Overview
14.2.2 Market Size & Forecast
14.3 Generators
14.3.1 Market Overview
14.3.2 Market Size & Forecast
14.4 Transfer Switches & Switchgear
14.4.1 Market Overview
14.4.2 Market Size & Forecast
14.5 Power Distribution Units
14.5.1 Market Overview
14.5.2 Market Size & Forecast
14.6 Other Electrical Infrastructure
14.6.1 Market Overview
14.6.2 Market Size & Forecast

15 Mechanical Infrastructure
15.1 Market Snapshot & Growth Engine
15.2 Cooling Systems
15.2.1 Market Overview
15.2.2 Market Size & Forecast
15.3 RACKS
15.3.1 Market Overview
15.3.2 Market Size & Forecast
15.4 Other Mechanical Infrastructure
15.4.1 Market Overview
15.4.2 Market Size & Forecast

16 Cooling Systems
16.1 Market Snapshot & Growth Engine
16.2 CRAC & CRAH Units
16.2.1 Market Overview
16.2.2 Market Size & Forecast
16.3 Chiller Units
16.3.1 Market Overview
16.3.2 Market Size & Forecast
16.4 Cooling Towers & Condensers & Dry Coolers
16.4.1 Market Overview
16.4.2 Market Size & Forecast
16.5 Economizers & Evaporative Coolers
16.5.1 Market Overview
16.5.2 Market Size & Forecast
16.6 Other Cooling Units
16.6.1 Market Overview
16.6.2 Market Size & Forecast

17 Cooling Technique
17.1 Market Snapshot & Growth Engine
17.2 Air-Based Cooling Techniques
17.2.1 Market Overview
17.2.2 Market Size & Forecast
17.3 Liquid-Based Cooling Techniques
17.3.1 Market Overview
17.3.2 Market Size & Forecast

18 Liquid Cooling Technique
18.1 Market Snapshot & Growth Engine
18.2 Water-Based Cooling Technique
18.2.1 Market Size & Forecast
18.3 Direct Liquid & Immersion Cooling Technique
18.3.1 Market Size & Forecast

19 General Construction
19.1 Market Snapshot & Growth Engine
19.2 Core & Shell Development
19.2.1 Market Overview
19.2.2 Market Size & Forecast
19.3 Installation & Commissioning Services
19.3.1 Market Overview
19.3.2 Market Size & Forecast
19.4 Building & Engineering Design
19.4.1 Market Overview
19.4.2 Market Size & Forecast
19.5 Physical Security
19.5.1 Market Overview
19.5.2 Market Size & Forecast
19.6 DCIM/BMS
19.6.1 Market Overview
19.6.2 Market Size & Forecast

20 Tier Standards
20.1 Market Snapshot & Growth Engine
20.2 Overview of Tier Standards
20.3 TIER I & II
20.3.1 Market Overview
20.3.2 Market Size & Forecast
20.4 TIER III
20.4.1 Market Overview
20.4.2 Market Size & Forecast
20.5 TIER IV
20.5.1 Market Overview
20.5.2 Market Size & Forecast

21 Geography
21.1 Market Snapshot & Growth Engine

22 North America

23 Latin America

24 Western Europe

25 Nordic Region

26 Central & Eastern Europe (CEE)

27 Middle East

28 Africa

29 APAC

30 Southeast Asia

31 Competitive Landscape
31.1 Electrical Infrastructure
31.2 Mechanical Infrastructure
31.3 General Construction

32 Key Data Center Support Infrastructure Providers
32.1 ABB
32.2 Eaton
32.3 Rittal
32.4 Schneider Electric
32.5 STULZ
32.6 Vertiv
32.7 Caterpillar
32.8 Cummins

33 Key Data Center Contractors
33.1 AECOM
33.2 BOUYGUES
33.3 DPR Construction
33.4 Holder Construction
33.5 Jacobs Engineering Group
33.6 Mercury Engineering
33.7 M+W Group

34 Key Data Center Investors
34.1 APPLE
34.2 AWS (Amazon Web Services)
34.3 Cyrusone
34.4 Digital Realty
34.5 Equinix
34.6 Facebook
34.7 GDS Holdings
34.8 Google
34.9 Microsoft
34.10 NTT Communications

35 Other Prominent Support Infrastructure Providers
35.1 Airedale Air Conditioning
35.2 Asetek
35.3 Alfa Laval
35.4 Altima Technologies (NETZOOM)
35.5 Assa Abloy
35.6 Bosch Security Systems (Robert Bosch)
35.7 Condair Group
35.8 Delta Group
35.9 Green Revolution Cooling
35.10 Hitech Power Protection
35.11 Kohler (SDMO)
35.12 Legrand
35.13 Nlyte Software
35.14 (Rolls-Royce Power Systems AG)
35.15 Mitsubishi
35.16 Socomec
35.17 Trane (Ingersoll Rand)
35.18 Zincfive

36 Other Prominent Construction Contractors
36.1 Arup Group
36.2 CAP Ingelec
36.3 Corgan
36.4 CSF Group
36.5 Faithful+Gould
36.6 Fluor Corporation
36.7 Fortis Construction
36.8 Gensler
36.9 Gilbane Building CO.
36.10 HDR Architecture
36.11 ISG
36.12 Jones Engineering
36.13 Kirby Group Engineering
36.14 KKR Investment Group (ACECO TI S.A.)
36.15 L&T (Larsen & Toubro)
36.16 Linesight
36.17 MACE Group
36.18 Morrison Hershfield
36.19 Mortenson Construction
36.20 Red-Engineering
36.21 Structure Tone
36.22 Syska Hennessy Group
36.23 WINTHROP

37 Other Prominent Data Center Investors
37.1 21VIANET (Century Internet Data Center)
37.2 Africa Data Centres
37.3 Cologix (COLO-D)
37.4 Colt Data Centre Services (COLT DCS)
37.5 Compass Data Centers (Root Data Center)
37.6 Copt Data Center Solutions
37.7 Coresite Realty
37.8 Canberra Data Centers
37.9 ETISALAT
37.10 Global Switch
37.11 Kepple DC
37.12 NEXTDC
37.13 QTS Realty Trust
37.14 ST Telemedia Global Data Centres
37.15 Shanghai ATHUB
37.16 Scala Data Centers
37.17 Tenglong Holdings Group (TAMRON)
37.18 Turkcell
37.19 Teraco Data Environments
37.20 Vantage Data Center

38 Report Summary
38.1 Key Takeaways

39 Quantitative Summary

40 Appendix
40.1 Abbreviations

For more information about this report visit https://www.researchandmarkets.com/r/xuathb

CONTACT: CONTACT: ResearchAndMarkets.com Laura Wood, Senior Press Manager press@researchandmarkets.com For E.S.T Office Hours Call 1-917-300-0470 For U.S./CAN Toll Free Call 1-800-526-8630 For GMT Office Hours Call +353-1-416-8900