Advertisement
UK markets close in 7 hours 7 minutes
  • FTSE 100

    8,115.87
    +37.01 (+0.46%)
     
  • FTSE 250

    19,773.68
    +171.70 (+0.88%)
     
  • AIM

    755.43
    +2.31 (+0.31%)
     
  • GBP/EUR

    1.1655
    -0.0002 (-0.02%)
     
  • GBP/USD

    1.2519
    +0.0008 (+0.06%)
     
  • Bitcoin GBP

    51,446.45
    +202.49 (+0.40%)
     
  • CMC Crypto 200

    1,387.35
    -9.19 (-0.66%)
     
  • S&P 500

    5,048.42
    -23.21 (-0.46%)
     
  • DOW

    38,085.80
    -375.12 (-0.98%)
     
  • CRUDE OIL

    83.84
    +0.27 (+0.32%)
     
  • GOLD FUTURES

    2,359.30
    +16.80 (+0.72%)
     
  • NIKKEI 225

    37,934.76
    +306.28 (+0.81%)
     
  • HANG SENG

    17,675.82
    +391.28 (+2.26%)
     
  • DAX

    18,028.99
    +111.71 (+0.62%)
     
  • CAC 40

    8,042.88
    +26.23 (+0.33%)
     

Groningen gas field production capped at 11.8bcm in 2019/2020 -government

AMSTERDAM, Sept 10 (Reuters) - Production at the Groningen gas field in the Netherlands will be slashed to 11.8 billion cubic metres (bcm) in 2019/2020, down around 40% from the current 12-month period through October, the Dutch government said on Tuesday.

The government said it also expected Groningen production to be stopped entirely by mid-2022, about eight years ahead of plan. (Reporting by Anthony Deutsch, editing by Louise Heavens)