Advertisement
UK markets close in 2 hours 57 minutes
  • FTSE 100

    8,157.59
    +36.35 (+0.45%)
     
  • FTSE 250

    19,992.96
    +66.37 (+0.33%)
     
  • AIM

    767.09
    +2.11 (+0.28%)
     
  • GBP/EUR

    1.1694
    +0.0010 (+0.09%)
     
  • GBP/USD

    1.2511
    -0.0013 (-0.10%)
     
  • Bitcoin GBP

    46,962.53
    +616.00 (+1.33%)
     
  • CMC Crypto 200

    1,272.03
    +1.29 (+0.10%)
     
  • S&P 500

    5,018.39
    -17.30 (-0.34%)
     
  • DOW

    37,903.29
    +87.37 (+0.23%)
     
  • CRUDE OIL

    79.72
    +0.72 (+0.91%)
     
  • GOLD FUTURES

    2,311.00
    0.00 (0.00%)
     
  • NIKKEI 225

    38,236.07
    -37.98 (-0.10%)
     
  • HANG SENG

    18,207.13
    +444.10 (+2.50%)
     
  • DAX

    17,951.54
    +19.37 (+0.11%)
     
  • CAC 40

    7,935.60
    -49.33 (-0.62%)
     

Operators extend Norway-Netherlands power cable outage to August for repairs

OSLO (Reuters) - The NorNed subsea power cable connecting Norway and the Netherlands will remain offline for "complex" repairs until Aug. 1, Norwegian grid operator Statnett said late on Tuesday.

The cable with a capacity of 723 megawatt between the two countries has been offline since May 6.

"Investigations have shown that a part of the cable has to be exchanged," Statnett said in a message to market participants.

The fault has been detected in a section just 30 metres from land running in the shallow Wadden Sea off the Dutch coast, which made the repairs "complex", as the location rules out the use of offshore vessels or equipment, the company added.

ADVERTISEMENT

Statnett has warned the south of Norway faced a "pressed" market situation this autumn due to low hydro reservoir levels and might have to rely more heavily on electricity imports.

The cable is jointly operated by Statnett and its Dutch counterpart Tennet.

(Reporting by Nora Buli, editing by Terje Solsvik)