Advertisement
UK markets closed
  • FTSE 100

    7,820.36
    -145.17 (-1.82%)
     
  • FTSE 250

    19,344.54
    -354.35 (-1.80%)
     
  • AIM

    738.28
    -12.00 (-1.60%)
     
  • GBP/EUR

    1.1696
    -0.0014 (-0.12%)
     
  • GBP/USD

    1.2431
    -0.0016 (-0.13%)
     
  • Bitcoin GBP

    49,750.36
    -2,331.47 (-4.48%)
     
  • CMC Crypto 200

    885.54
    0.00 (0.00%)
     
  • S&P 500

    5,061.91
    +0.09 (+0.00%)
     
  • DOW

    37,900.00
    +164.89 (+0.44%)
     
  • CRUDE OIL

    85.48
    +0.07 (+0.08%)
     
  • GOLD FUTURES

    2,404.80
    +21.80 (+0.91%)
     
  • NIKKEI 225

    38,471.20
    -761.60 (-1.94%)
     
  • HANG SENG

    16,248.97
    -351.49 (-2.12%)
     
  • DAX

    17,766.23
    -260.35 (-1.44%)
     
  • CAC 40

    7,932.61
    -112.50 (-1.40%)
     

Roche sees problems from warehouse glitch in Britain 'cleared out' by weekend

A diagnostics site for Swiss pharmaceutical giant Roche is seen as the company said problems at a new warehouse delayed the dispatch of some products

ZURICH (Reuters) - Roche <ROG.S> said any lingering affects of a logistics glitch in Britain should be "cleared out" by the weekend, after the Swiss drugmaker delivered 80 tonnes of diagnostics equipment to the National Health Service (NHS) to help solve the problem.

A robot broke down as Roche was moving to a new U.K. warehouse, blocking deliveries of diagnostic equipment for a range of tests including for magnesium levels. The problems did not impact the company's COVID-19 tests, Roche said.

"There was a breakdown with one of the robots. This problem is fixed," said Roche diagnostics head Thomas Schinecker on a call with analysts on Thursday. "We're going to ship more than 80 tonnes of diagnostics products (from Germany) into the U.K. And the last of that will arrive in the U.K. at the end of this week and the weekend so that this should be completely cleared out."

(Reporting by John Miller)