Advertisement
UK markets close in 2 hours 31 minutes
  • FTSE 100

    7,963.51
    +31.53 (+0.40%)
     
  • FTSE 250

    19,878.09
    +67.43 (+0.34%)
     
  • AIM

    743.92
    +1.81 (+0.24%)
     
  • GBP/EUR

    1.1695
    +0.0026 (+0.22%)
     
  • GBP/USD

    1.2648
    +0.0010 (+0.08%)
     
  • Bitcoin GBP

    56,041.30
    +636.17 (+1.15%)
     
  • CMC Crypto 200

    885.54
    0.00 (0.00%)
     
  • S&P 500

    5,250.87
    +2.38 (+0.05%)
     
  • DOW

    39,766.32
    +6.24 (+0.02%)
     
  • CRUDE OIL

    82.29
    +0.94 (+1.16%)
     
  • GOLD FUTURES

    2,230.00
    +17.30 (+0.78%)
     
  • NIKKEI 225

    40,168.07
    -594.66 (-1.46%)
     
  • HANG SENG

    16,541.42
    +148.58 (+0.91%)
     
  • DAX

    18,496.13
    +19.04 (+0.10%)
     
  • CAC 40

    8,220.89
    +16.08 (+0.20%)
     

Transport for London suspends construction work on Crossrail

LONDON, March 24 (Reuters) - Transport for London said on Tuesday it was temporarily suspending construction work at its sites, including the delayed Crossrail railway project, to help limit the spread of coronavirus.

(Reporting by Paul Sandle; editing by Costas Pitas)