Advertisement
UK markets close in 3 hours 7 minutes
  • FTSE 100

    7,866.73
    +18.74 (+0.24%)
     
  • FTSE 250

    19,397.68
    +57.54 (+0.30%)
     
  • AIM

    744.38
    +1.26 (+0.17%)
     
  • GBP/EUR

    1.1678
    +0.0011 (+0.09%)
     
  • GBP/USD

    1.2459
    +0.0003 (+0.02%)
     
  • Bitcoin GBP

    50,076.29
    -323.90 (-0.64%)
     
  • CMC Crypto 200

    885.54
    0.00 (0.00%)
     
  • S&P 500

    5,022.21
    -29.20 (-0.58%)
     
  • DOW

    37,753.31
    -45.66 (-0.12%)
     
  • CRUDE OIL

    82.13
    -0.56 (-0.68%)
     
  • GOLD FUTURES

    2,400.40
    +12.00 (+0.50%)
     
  • NIKKEI 225

    38,079.70
    +117.90 (+0.31%)
     
  • HANG SENG

    16,385.87
    +134.03 (+0.82%)
     
  • DAX

    17,768.82
    -1.20 (-0.01%)
     
  • CAC 40

    8,009.29
    +27.78 (+0.35%)
     

UK gas storage site Rough to switch to single train injection around Aug 6

Aug 3 (Reuters) - Britain's biggest gas storage site, Rough, is to move from dual train to single train gas injection on or around Aug. 6, its operator Centrica (LSE: CNA.L - news) said on Monday.

"The exact date will depend on a number of factors, including customer nominations," the British utility said.

Centrica last month said it would extend a limit on the maximum operating pressure at Rough until the end of 2016 after it discovered a potential issue with well integrity.

The trains, or compressors, are used to inject gas into the facility. (Reporting by Oleg Vukmanovic in Milan, editing by Louise Heavens)