UK markets close in 2 hours 24 minutes
  • FTSE 100

    6,623.54
    +35.01 (+0.53%)
     
  • FTSE 250

    21,233.82
    +12.36 (+0.06%)
     
  • AIM

    1,190.64
    -1.53 (-0.13%)
     
  • GBP/EUR

    1.1568
    +0.0015 (+0.13%)
     
  • GBP/USD

    1.3921
    +0.0000 (+0.00%)
     
  • BTC-GBP

    35,218.35
    +426.41 (+1.23%)
     
  • CMC Crypto 200

    987.07
    +0.42 (+0.04%)
     
  • S&P 500

    3,901.82
    +90.67 (+2.38%)
     
  • DOW

    31,535.51
    +603.14 (+1.95%)
     
  • CRUDE OIL

    60.87
    +0.23 (+0.38%)
     
  • GOLD FUTURES

    1,726.30
    +3.30 (+0.19%)
     
  • NIKKEI 225

    29,408.17
    -255.33 (-0.86%)
     
  • HANG SENG

    29,095.86
    -356.71 (-1.21%)
     
  • DAX

    14,069.54
    +56.72 (+0.40%)
     
  • CAC 40

    5,819.52
    +26.73 (+0.46%)
     

Worldwide Data Center Construction Industry to 2026 - by Construction Type, Data Center Type, Tier Standards, Vertical and Region

Research and Markets
·9-min read

Dublin, Feb. 23, 2021 (GLOBE NEWSWIRE) -- The "Data Center Construction Market: Global Industry Trends, Share, Size, Growth, Opportunity and Forecast 2021-2026" report has been added to ResearchAndMarkets.com's offering.

The global data center construction market reached a value of US$ 203.4 Billion in 2020. Data center construction refers to the collective process of physically constructing a data center facility. The primary focus is on designing and building a data center with the required capacity, disaster tolerance systems and efficient design to perform all the necessary functions. The infrastructure usually consists of backup power supplies, data communication connections, security devices and air conditioning and fire suppression systems. This ensures that all the resources are optimally utilized, and all the environmental factors are taken into consideration.

Significant growth in the IT industry is one of the key factors creating a positive outlook for the market. The rising penetration of connected devices and convenient access to the Internet have increased the demand for data storage systems across the globe. Furthermore, widespread utilization of big data analytics, cloud-based systems and the Internet of Things (IoT) for computing videos, audio and other formats of data is also driving the market growth. Large data centers are increasingly being constructed across various sectors for enhancing computing ability, memory, networking infrastructure and storage resources.

Additionally, increasing emphasis on the construction of green data centers is acting as another growth-inducing factor. Green data centers use low-emission building materials that aid in creating sustainable ecosystems and ensure efficient waste recycling. Other factors, including the increasing adoption of liquid cooling technology and direct-to-chip cooling server racks to prevent overheating in data centers, along with extensive infrastructural developments, are expected to drive the market further. Looking forward, the publisher expects the global data center construction market to exhibit moderate growth during the next five years.

Breakup by Construction Type:

  • Electrical Construction

  • UPS

  • Rack PDU (Power Distribution Unit)

  • Generators

  • Transfer Switches and Switchgears

  • Others

  • Mechanical Construction

  • Cooling Systems

  • Racks

  • Others

Breakup by Data Center Type:

  • Mid-Size Data Centers

  • Enterprise Data Centers

  • Large Data Centers

Breakup by Tier Standards:

  • Tier I & II

  • Tier III

  • Tier IV

Breakup by Vertical:

  • Public Sector

  • Oil & Energy

  • Media & Entertainment

  • IT & Telecommunication

  • Banking, Financial Services and Insurance (BFSI)

  • Healthcare

  • Retail

  • Others

Breakup by Region:

  • North America

  • United States

  • Canada

  • Asia Pacific

  • China

  • Japan

  • India

  • South Korea

  • Australia

  • Indonesia

  • Others

  • Europe

  • Germany

  • France

  • United Kingdom

  • Italy

  • Spain

  • Russia

  • Others

  • Latin America

  • Brazil

  • Mexico

  • Others

  • Middle East and Africa

  • Turkey

  • Saudi Arabia

  • Others

Competitive Landscape:

The competitive landscape of the industry has also been examined with some of the key players being AECOM, DPR construction Inc., Eaton Corporation Inc., Fujitsu Limited, Holder Construction Company, Legrand SA, Rittal GmbH & Co. KG, Schneider Electric SE, Tripp Lite, Turner Construction and Vertiv Group Corporation.

Key Questions Answered in This Report:

  • How has the global data center construction market performed so far and how will it perform in the coming years?

  • What has been the impact of COVID-19 on the global data center construction market?

  • What are the key regional markets?

  • What is the breakup of the market based on the construction type?

  • What is the breakup of the market based on the data center type?

  • What is the breakup of the market based on the tier standards?

  • What is the breakup of the market based on the vertical?

  • What are the various stages in the value chain of the industry?

  • What are the key driving factors and challenges in the industry?

  • What is the structure of the global data center construction market and who are the key players?

  • What is the degree of competition in the industry?

Key Topics Covered:

1 Preface

2 Scope and Methodology
2.1 Objectives of the Study
2.2 Stakeholders
2.3 Data Sources
2.3.1 Primary Sources
2.3.2 Secondary Sources
2.4 Market Estimation
2.4.1 Bottom-Up Approach
2.4.2 Top-Down Approach
2.5 Forecasting Methodology

3 Executive Summary

4 Introduction
4.1 Overview
4.2 Key Industry Trends

5 Global Data Center Construction Market
5.1 Market Overview
5.2 Market Performance
5.3 Impact of COVID-19
5.4 Market Forecast

6 Market Breakup by Construction Type
6.1 Electrical Construction
6.1.1 Market Trends
6.1.2 Market Breakup by Component Type
6.1.3 Market Forecast
6.2 Mechanical Construction
6.2.1 Market Trends
6.2.2 Market Breakup by Component Type
6.2.3 Market Forecast

7 Market Breakup by Data Center Type
7.1 Mid-size Data Centers
7.1.1 Market Trends
7.1.2 Market Forecast
7.2 Enterprise Data Centers
7.2.1 Market Trends
7.2.2 Market Forecast
7.3 Large Data Centers
7.3.1 Market Trends
7.3.2 Market Forecast

8 Market Breakup by Tier Standards
8.1 Tier I & II
8.1.1 Market Trends
8.1.2 Market Forecast
8.2 Tier III
8.2.1 Market Trends
8.2.2 Market Forecast
8.3 Tier IV
8.3.1 Market Trends
8.3.2 Market Forecast

9 Market Breakup by Vertical
9.1 Public Sector
9.1.1 Market Trends
9.1.2 Market Forecast
9.2 Oil & Energy
9.2.1 Market Trends
9.2.2 Market Forecast
9.3 Media & Entertainment
9.3.1 Market Trends
9.3.2 Market Forecast
9.4 IT & Telecommunication
9.4.1 Market Trends
9.4.2 Market Forecast
9.5 Banking, Financial Services and Insurance (BFSI)
9.5.1 Market Trends
9.5.2 Market Forecast
9.6 Healthcare
9.6.1 Market Trends
9.6.2 Market Forecast
9.7 Retail
9.7.1 Market Trends
9.7.2 Market Forecast
9.8 Others
9.8.1 Market Trends
9.8.2 Market Forecast

10 Market Breakup by Region
10.1 North America
10.1.1 United States
10.1.1.1 Market Trends
10.1.1.2 Market Forecast
10.1.2 Canada
10.1.2.1 Market Trends
10.1.2.2 Market Forecast
10.2 Asia Pacific
10.2.1 China
10.2.1.1 Market Trends
10.2.1.2 Market Forecast
10.2.2 Japan
10.2.2.1 Market Trends
10.2.2.2 Market Forecast
10.2.3 India
10.2.3.1 Market Trends
10.2.3.2 Market Forecast
10.2.4 South Korea
10.2.4.1 Market Trends
10.2.4.2 Market Forecast
10.2.5 Australia
10.2.5.1 Market Trends
10.2.5.2 Market Forecast
10.2.6 Indonesia
10.2.6.1 Market Trends
10.2.6.2 Market Forecast
10.2.7 Others
10.2.7.1 Market Trends
10.2.7.2 Market Forecast
10.3 Europe
10.3.1 Germany
10.3.1.1 Market Trends
10.3.1.2 Market Forecast
10.3.2 France
10.3.2.1 Market Trends
10.3.2.2 Market Forecast
10.3.3 United Kingdom
10.3.3.1 Market Trends
10.3.3.2 Market Forecast
10.3.4 Italy
10.3.4.1 Market Trends
10.3.4.2 Market Forecast
10.3.5 Spain
10.3.5.1 Market Trends
10.3.5.2 Market Forecast
10.3.6 Russia
10.3.6.1 Market Trends
10.3.6.2 Market Forecast
10.3.7 Others
10.3.7.1 Market Trends
10.3.7.2 Market Forecast
10.4 Latin America
10.4.1 Brazil
10.4.1.1 Market Trends
10.4.1.2 Market Forecast
10.4.2 Mexico
10.4.2.1 Market Trends
10.4.2.2 Market Forecast
10.4.3 Others
10.4.3.1 Market Trends
10.4.3.2 Market Forecast
10.5 Middle East and Africa
10.5.1 Turkey
10.5.1.1 Market Trends
10.5.1.2 Market Forecast
10.5.2 Saudi Arabia
10.5.2.1 Market Trends
10.5.2.2 Market Forecast
10.5.3 Others
10.5.3.1 Market Trends
10.5.3.2 Market Forecast

11 SWOT Analysis
11.1 Overview
11.2 Strengths
11.3 Weaknesses
11.4 Opportunities
11.5 Threats

12 Value Chain Analysis

13 Porters Five Forces Analysis
13.1 Overview
13.2 Bargaining Power of Buyers
13.3 Bargaining Power of Suppliers
13.4 Degree of Competition
13.5 Threat of New Entrants
13.6 Threat of Substitutes

14 Price Analysis

15 Competitive Landscape
15.1 Market Structure
15.2 Key Players
15.3 Profiles of Key Players
15.3.1 AECOM
15.3.1.1 Company Overview
15.3.1.2 Product Portfolio
15.3.1.3 Financials
15.3.1.4 SWOT Analysis
15.3.2 DPR construction Inc.
15.3.2.1 Company Overview
15.3.2.2 Product Portfolio
15.3.2.3 SWOT Analysis
15.3.3 Eaton Corporation Inc.
15.3.3.1 Company Overview
15.3.3.2 Product Portfolio
15.3.4 Fujitsu Limited
15.3.4.1 Company Overview
15.3.4.2 Product Portfolio
15.3.5 Holder Construction Company
15.3.5.1 Company Overview
15.3.5.2 Product Portfolio
15.3.6 Legrand SA
15.3.6.1 Company Overview
15.3.6.2 Product Portfolio
15.3.7 Rittal GmbH & Co. KG
15.3.7.1 Company Overview
15.3.7.2 Product Portfolio
15.3.8 Schneider Electric SE
15.3.8.1 Company Overview
15.3.8.2 Product Portfolio
15.3.8.3 Financials
15.3.9 Tripp Lite
15.3.9.1 Company Overview
15.3.9.2 Product Portfolio
15.3.10 Turner Construction
15.3.10.1 Company Overview
15.3.10.2 Product Portfolio
15.3.11 Vertiv Group Corporation
15.3.11.1 Company Overview
15.3.11.2 Product Portfolio

For more information about this report visit https://www.researchandmarkets.com/r/1qz4sp

CONTACT: CONTACT: ResearchAndMarkets.com Laura Wood, Senior Press Manager press@researchandmarkets.com For E.S.T Office Hours Call 1-917-300-0470 For U.S./CAN Toll Free Call 1-800-526-8630 For GMT Office Hours Call +353-1-416-8900