UK markets closed

AS Tallinna Sadam (TSM1T.TL)

Tallinn - Tallinn Real-time price. Currency in EUR
Add to watchlist
1.2140-0.0040 (-0.33%)
At close: 03:59PM EEST
Full screen
Previous close1.2180
Open1.2180
Bid1.2100 x 0
Ask1.2140 x 0
Day's range1.2100 - 1.2180
52-week range1.1000 - 1.4700
Volume34,373
Avg. volume33,884
Market cap319.282M
Beta (5Y monthly)0.43
PE ratio (TTM)20.23
EPS (TTM)0.0600
Earnings date10 May 2024
Forward dividend & yield0.07 (5.99%)
Ex-dividend date08 May 2024
1y target est1.10
  • Globe Newswire

    Icebreaker Botnica summer charter contract with Baffinland for 2024-2028

    AS Tallinna Sadam subsidiary OÜ TS Shipping (hereinafter: "TS Shipping") and Baffinland Iron Mines Corporation (hereinafter: Baffinland) extended the agreement signed in 2018 for MS Botnica to assist cargo vessels in the Arctic waters of Canada. The MS Botnica will escort Panamax-type vessels loaded with iron ore from Milne Inlet Port to the ocean. This contractual arrangement spans the period from 2024 to 2028 and includes the annual call options to charter the ship at least 60 days per year fr

  • GlobeNewswire

    Tallinna Sadam subsidiary OÜ TS Laevad won the ferry service tender for the period 2026-2033

    The Ministry of Regional Affairs and Agricultural (hereinafter: "Ministry") declared successful the tender of OÜ TS Laevad (hereinafter: "TS Laevad"), a subsidiary of AS Tallinna Sadam, in the public procurement, which was looking for a partner for the award of a public service contract for passenger transport on the Virtsu-Kuivastu and Rohuküla-Heltermaa ferry routes. On the basis of the successful tender, a passenger transport public service contract will be awarded between the Ministry and TS

  • GlobeNewswire

    Icebreaker Botnica summer charter contract with BP for 2024

    The subsidiary company of AS Tallinna Sadam, OÜ TS Shipping, signed an agreement with BP Exploration Operating Company Ltd (hereinafter: BP) for chartering multifunctional icebreaker Botnica from May to July 2024 with the option to extend the term until 5 August, the charter period in total is up to 12 weeks. BP is a multinational energy company based in UK. According to the scope of service, Botnica will be chartered as a service operation vessel to support work scopes at BP’s Mungo normally un