Advertisement
UK markets closed
  • FTSE 100

    8,139.83
    +60.97 (+0.75%)
     
  • FTSE 250

    19,824.16
    +222.18 (+1.13%)
     
  • AIM

    755.28
    +2.16 (+0.29%)
     
  • GBP/EUR

    1.1679
    +0.0022 (+0.19%)
     
  • GBP/USD

    1.2491
    -0.0020 (-0.16%)
     
  • Bitcoin GBP

    51,083.65
    -660.93 (-1.28%)
     
  • CMC Crypto 200

    1,329.06
    -67.47 (-4.83%)
     
  • S&P 500

    5,099.96
    +51.54 (+1.02%)
     
  • DOW

    38,239.66
    +153.86 (+0.40%)
     
  • CRUDE OIL

    83.66
    +0.09 (+0.11%)
     
  • GOLD FUTURES

    2,349.60
    +7.10 (+0.30%)
     
  • NIKKEI 225

    37,934.76
    +306.28 (+0.81%)
     
  • HANG SENG

    17,651.15
    +366.61 (+2.12%)
     
  • DAX

    18,161.01
    +243.73 (+1.36%)
     
  • CAC 40

    8,088.24
    +71.59 (+0.89%)
     

Ryanair warns of job losses as 737 MAX delivery date slips

Ryanair Boeing 737-8AS plane EI-EKG lands in Riga International Airport in Riga

DUBLIN (Reuters) - Ryanair <RYA.I> has warned pilots of possible base closures and job cuts as the date for delivery of its first 10 of Boeing's <BA.N> grounded 737 MAX aircraft slipped into the autumn. In a memo dated Jan. 27 seen by Reuters, the low-cost airline said Boeing would not deliver the first aircraft until September or October at the earliest, as Ryanair does not take deliveries during its peak summer months of June, July and August.

(Reporting by Louise Heavens, editing by Louise Heavens)