Advertisement
UK markets closed
  • FTSE 100

    8,285.71
    +99.36 (+1.21%)
     
  • FTSE 250

    21,356.30
    +471.95 (+2.26%)
     
  • AIM

    779.67
    +6.64 (+0.86%)
     
  • GBP/EUR

    1.1844
    -0.0006 (-0.05%)
     
  • GBP/USD

    1.2873
    +0.0019 (+0.14%)
     
  • Bitcoin GBP

    53,553.62
    +948.15 (+1.80%)
     
  • CMC Crypto 200

    1,391.45
    +60.84 (+4.57%)
     
  • S&P 500

    5,459.10
    +59.88 (+1.11%)
     
  • DOW

    40,589.34
    +654.27 (+1.64%)
     
  • CRUDE OIL

    76.44
    -1.84 (-2.35%)
     
  • GOLD FUTURES

    2,385.70
    +32.20 (+1.37%)
     
  • NIKKEI 225

    37,667.41
    -202.10 (-0.53%)
     
  • HANG SENG

    17,021.31
    +16.34 (+0.10%)
     
  • DAX

    18,417.55
    +118.83 (+0.65%)
     
  • CAC 40

    7,517.68
    +90.66 (+1.22%)
     

Siemens Energy can't deliver turbine to Nord Stream 1 operator

FILE PHOTO: Siemens Energy AG starts trading after IPO

FRANKFURT (Reuters) - Siemens Energy on Tuesday said it was unable to hand back an aeroderivative gas turbine currently being overhauled in Canada to the operator of the Nord Stream 1 pipeline due to sanctions.

An absence of the equipment has been cited by Gazprom as the reason behind lower flows through the pipeline.

"Due to the sanctions imposed by Canada, it is currently impossible for Siemens Energy to deliver overhauled gas turbines to the customer," the company said.

"Against this background we have informed the Canadian and German government and are working on a viable solution."

(Reporting by Christoph Steitz; Editing by Jan Harvey)