UK Markets closed

Prosafe SE (PRSEF)

OTC Markets OTCPK - OTC Markets OTCPK Delayed price. Currency in USD
Add to watchlist
4.95000.0000 (0.00%)
At close: 04:00PM EDT
Full screen
Previous close4.8500
YTD returnN/A
Expense ratio (net)N/A
CategoryN/A
Last cap gainN/A
Morningstar ratingN/A
Morningstar risk ratingN/A
Sustainability ratingN/A
Net assetsN/A
Beta (5Y monthly)N/A
YieldN/A
5y average returnN/A
Holdings turnoverN/A
Last dividendN/A
Average for categoryN/A
Inception dateN/A
  • GlobeNewswire

    Prosafe SE: Operational update – July 2024

    Fleet utilisation for Q2 2024 was 56 percent. In Q2 2024, Safe Eurus and Safe Concordia both achieved 100% utilisation. Safe Notos reached 99%, while Safe Zephyrus had a 98% utilisation due to necessary maintenance work. Prosafe entered into a Letter of Intent (LoI) with Ithaca Energy (UK) Limited for the deployment of the Safe Caledonia at the Captain field in the UK sector of the North Sea starting in Q2 2025. The minimum firm operational period is six months, with an additional three months o

  • GlobeNewswire

    Prosafe SE: Safe Caledonia awarded Letter of Intent

    5th July 2024 Prosafe has been issued a Letter of Intent (LoI) from Ithaca Energy (UK) Limited for the charter of the Safe Caledonia to provide gangway connected accommodation support at the Captain field in the UK sector of the North Sea. The firm duration of the contract commencing June 2025 is 6 months with up to 3 months of options and final contract award is subject to meeting certain site specific technical criteria. The Safe Caledonia will undergo its five-yearly special periodic survey a

  • Globe Newswire

    Prosafe SE: Operational Update - June 2024

    Oslo, 20 June 2024 Fleet utilisation for May 2024 was 57 percent. All operational rigs, Safe Eurus, Safe Notos, Safe Zephyrus and Safe Concordia, achieved 100 percent utilisation in May 2024. Prosafe entered into a Conditional Letter of Intent (CLoI) for Safe Boreas and will mobilise the vessel from the North Sea within Q2 2025. Safe Boreas will support a project off the coast of Western Australia for a minimum firm operational period of 15 months, with an additional six months of options. Safe