UK markets closed

Li-FT Power Ltd (WS0.MU)

Munich - Munich Delayed price. Currency in EUR
Add to watchlist
2.5300-0.1050 (-3.98%)
At close: 08:04AM CEST
Full screen
Previous close2.6350
Open2.5300
Bid2.4550 x N/A
Ask2.5500 x N/A
Day's range2.5300 - 2.5300
52-week range1.8580 - 6.3600
Volume1,000
Avg. volume95
Market capN/A
Beta (5Y monthly)N/A
PE ratio (TTM)N/A
EPS (TTM)N/A
Earnings dateN/A
Forward dividend & yieldN/A (N/A)
Ex-dividend dateN/A
1y target estN/A
  • GlobeNewswire

    LIFT intersects 33 m at 1.09% Li2O at its Echo pegmatite, Yellowknife Lithium Project, NWT

    VANCOUVER, British Columbia, May 28, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 13 drill holes completed at the Shorty, BIG East, Echo, Fi Main, & Ki pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling intersected significant intervals of spodumene mineralization, with the following highlights: Highlights:

  • GlobeNewswire

    LIFT intersects 35 m at 1.32% Li2O at its Shorty pegmatite, Yellowknife Lithium Project, NWT

    VANCOUVER, British Columbia, May 22, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 12 drill holes completed at the Shorty, BIG East, Echo, Fi Main, & Ki pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling intersected significant intervals of spodumene mineralization, with the following highlights: Highlights:

  • GlobeNewswire

    LIFT reports grab samples up to 3% Li2O within 1 km by 1.5 km area at the Cali Lithium Project, NWT, Canada

    VANCOUVER, British Columbia, May 07, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to provide an update on surface work completed during the summer of 2023 at the Cali Lithium Project, Northwest Territories (Figure 1). During the summer surface program in 2023, LIFT completed a soil geochemistry survey covering the Cali Property, as well as a mapping and prospecting campaign. Rock sampling and mapping indicate that the